|
This content is available for purchase. It is FREE of charge for ENR subscribers. |
Wetlands: EPA Blocks Corps Yazoo Pumping Project - ENR | McGraw-Hill Construction
Publication Date: 03-SEP-08
Author: Tom Ichniowski Format: HTML
|
|
|
Description: The Environmental Protection Agency has barred the Corps of Engineers from building a flood-control project in the Mississippi Delta on grounds that it would harm wetlands and wildlife. EPA’s final decision, announced on Sept. 2, blocks the Yazoo Backwater Project, which includes a 14,000-cu-ft-per-second pumping station to drain rainwater during Mississippi floods. The project was first authorized in 1941 and has an estimated construction cost of $220 million and operating costs of $2 million a year. EPA says it will work with federal and state agencies to find an alternative plan.
Generic Keywords: (What are these?)
Construction Industry, News Articles, Business Conditions & Analysis, Markets, Finance, Costs, Legislation, Government, Management, Labor, Construction Methods, Equipment & Materials, Engineering News-Record (ENR)
|
|
----- Advertising -----
----- Advertising -----
|
|
|
|