|
This content is available for purchase. It is FREE of charge for ENR subscribers. |
Seepage Stopped by Prompt Action, Overwhelming Force
Publication Date: 19-NOV-08
Author: Tony Illia Format: HTML
|
|
|
Description: A near failure of Arthur V. Watkins Dam, a leaking U-shaped earth-fill levee structure located 10 miles northwest of Ogden, Utah, is prompting a compressed-schedule repair, squeezing two years of work into one. The dam was within a few days of failure, U.S. Bureau of Reclamation officials say, threatening lives and major flood damage to surrounding property. General contractor Geo-Solutions Inc., New Kensington, Pa., is consequently running double shifts and using specially modified equipment to speed up repair work. It designed a 150-cu-yd-per-hour slurry plant fed by twin 60-ton silos for three times the output of a typical facility. Geo-Solutions additionally customized a Komatsu PC1250 hydraulic excavator with a hybrid boom stick that can extend 85 ft for tough excavations.
Generic Keywords: (What are these?)
Construction Industry, News Articles, Business Conditions & Analysis, Markets, Finance, Costs, Legislation, Government, Management, Labor, Construction Methods, Equipment & Materials, Engineering News-Record (ENR)
|
|
----- Advertising -----
----- Advertising -----
|
|
|
|