|
This content is available for purchase. It is FREE of charge for ENR subscribers. |
Unexpected Bay Bridge Crack Slightly Delays Reopening
Publication Date: 09-SEP-09
Author: Robert Carlsen Format: HTML
|
|
|
Description: An unexpected crack found in a section of the Oakland-San Francisco Bay Bridge delayed the planned Sept. 8 reopening only by about 90 minutes, rather than a full day, thanks to fast delivery from a fabricator and non-stop work by the contractor. Although the $140-million removal of a 3,200-ton double-deck section went as planned, California Dept. of Transportation inspection crews then reported a crack in an eyebar—a 2-in.-thick, chainlike steel piece—located on another section of the east span.
Generic Keywords: (What are these?)
Construction Industry, News Articles, Business Conditions & Analysis, Markets, Finance, Costs, Legislation, Government, Management, Labor, Construction Methods, Equipment & Materials, Engineering News-Record (ENR)
|
|
----- Advertising -----
----- Advertising -----
|
|
|
|