|
This content is available for purchase. It is FREE of charge for ENR subscribers. |
Steely Determination, Design Save a California Crossing
Publication Date: 04-MAR-09
Author: Aileen Cho Format: HTML
|
|
|
Description: A switch to steel and six weeks of swift redesign saved a city’s dream of a signature pedestrian crossing with a 325-ft main span over 10 lanes of Interstate 280 in Silicon Valley. The first cable-stayed crossing over a freeway in California, the city of Cupertino’s Mary Avenue Bridge seemed doomed in 2007 after a concrete design received two bids double the $6 million budget. But thanks to the city calling on key industry contacts, it is slated to open next month.
Generic Keywords: (What are these?)
Construction Industry, News Articles, Business Conditions & Analysis, Markets, Finance, Costs, Legislation, Government, Management, Labor, Construction Methods, Equipment & Materials, Engineering News-Record (ENR)
|
|
----- Advertising -----
----- Advertising -----
|
|
|
|