Print this Articleprint this article   

Financing Contributes to Death Of $200-Billion Texas Corridor

Text size: A A

The Texas Dept. of Transportation announced on Jan. 6 that it pulled the plug on the estimated $200-billion Trans-Texas Corridor, a vision introduced by TxDOT and Texas Gov. Rick Perry (R) in 2002. TxDOT Executive Director Amadeo Saenz Jr. made the announcement during the fourth annual Texas Transportation Forum in Austin. Projects already started under the heading of the Trans-Texas-Corridor will continue as a series of individual projects. Portions of two TTC projects are under development: Interstate 69 from Texarkana/Shreveport to the Mexico border and the I-35 corridor from north of Dallas/Fort Worth to Mexico. Perry cited financing as a major concern in the agency’s decision. The Trans-Texas Corridor called for some 4,000 miles of new and upgraded highways, railways and utility rights-of-way located in dedicated corridors.

----- Advertising -----

 

----- Advertising -----
Video Library
ENR's library has 100s of videos featuring eye-opening explorations of the world's most fascinating projects; exclusive reports on "extreme construction" and new techniques; and must-watch interviews with industry leaders.
ENR's Top Lists
ENR attempts to bring structure to an otherwise huge and chaotic industry by performing annual survey and ranking companies engaged in general contracting, specialty contracting, engineering, architecture, planning and studies. View all.
ENR's Source Books
ENR publishes various sourcebooks each year which rank design firms, contractors participating in our surveys in almost fifty separate market sectors, giving them an opportunity to demonstrate their particular areas of expertise. View all.
Find a job in the Career Center