|
This content is available for purchase. It is FREE of charge for ENR subscribers. |
European Nuke Supplier Regroups for Sales
Publication Date: 18-NOV-09
Author: Peter Reina Format: HTML
|
|
|
Description: As the U.K. begins to fast-track nuclear power permitting, its safety regulator and those of Finland and France have sent Europe’s main nuclear plant supplier back to the drawing board. Already grappling with construction delays at its first EPR pressurized water reactor project—Finland’s Olkiluoto 3 (OL3) plant—Areva Np., Paris, must now also rethink key safety systems. In an unusual joint move, nuclear safety regulators in the U.K., Finland and France recently revealed safety concerns about the EPR’s control and instrumentation (C&I) systems.
Generic Keywords: (What are these?)
Construction Industry, News Articles, Business Conditions & Analysis, Markets, Finance, Costs, Legislation, Government, Management, Labor, Construction Methods, Equipment & Materials, Engineering News-Record (ENR)
|
|
----- Advertising -----
----- Advertising -----
|
|
|
|