|
This content is available for purchase. It is FREE of charge for ENR subscribers. |
Seismic Retrofit Under Way At East Bay Impoundment
Publication Date: 08-JUL-09
Author: William J. Angelo Format: HTML
|
|
|
Description: To safeguard downstream residents, work now is under way in California to seismically upgrade the San Pablo Dam. The $54-million project involves removing an existing buttress, strengthening the downstream foundation using cement deep-soil mixing and constructing a new 85-ft-high by 950-ft-long buttress. The San Pablo Dam, located near El Sobrante, is an 89-year-old, 38,600 acre-ft drinking-water impoundment. It is managed by the East Bay Municipal Utility District (EBMUD), which serves 1.3 million people in parts of Alameda and Contra Costa counties.
Generic Keywords: (What are these?)
Construction Industry, News Articles, Business Conditions & Analysis, Markets, Finance, Costs, Legislation, Government, Management, Labor, Construction Methods, Equipment & Materials, Engineering News-Record (ENR)
|
|
----- Advertising -----
----- Advertising -----
|
|
|
|