This content is available for purchase. It is FREE of charge for ENR subscribers.

Seismic Retrofit Under Way At East Bay Impoundment

Publication Date: 08-JUL-09
Author: William J. Angelo
Format: HTML

   
Description:
To safeguard downstream residents, work now is under way in California to seismically upgrade the San Pablo Dam. The $54-million project involves removing an existing buttress, strengthening the downstream foundation using cement deep-soil mixing and constructing a new 85-ft-high by 950-ft-long buttress. The San Pablo Dam, located near El Sobrante, is an 89-year-old, 38,600 acre-ft drinking-water impoundment. It is managed by the East Bay Municipal Utility District (EBMUD), which serves 1.3 million people in parts of Alameda and Contra Costa counties.
SUBSCRIBER LOGIN
Forgot your password?
loginregister subscription
Monthly Subscription:
Access all articles published on ENR.com for only $9.95/Month.
Annual Subscription:
Get ENR magazine for one year and access to all articles published on ENR.com, along with ENR daily news alerts and weekly newsletters for only $82/Year.
add to cart

Generic Keywords: (What are these?)
Construction Industry, News Articles, Business Conditions & Analysis, Markets, Finance, Costs, Legislation, Government, Management, Labor, Construction Methods, Equipment & Materials, Engineering News-Record (ENR)
----- Advertising -----
ENR's Top Lists
ENR attempts to bring structure to an otherwise huge and chaotic industry by performing annual survey and ranking companies engaged in general contracting, specialty contracting, engineering, architecture, planning and studies. View all.
ENR's Source Books
ENR publishes various sourcebooks each year which rank design firms, contractors participating in our surveys in almost fifty separate market sectors, giving them an opportunity to demonstrate their particular areas of expertise. View all.
Find a job in the Career Center
----- Advertising -----