This content is available for purchase. It is FREE of charge for ENR subscribers.

AECOM Analysis Cites ‘Slime’ As Factor in TVA Coal-Ash Spill

Publication Date: 01-JUL-09
Author: Pam Radtke Russell with Debra Rubin
Format: HTML

   
Description:
An unstable and weak slime-like foundation was the primary factor behind the Dec. 22, 2008, catastrophic failure of a coal-ash pond at Tennessee Valley Authority’s Kingston plant near Knoxville, Tenn., says a root-cause analysis released last week by AECOM Technology Corp. TVA hired the firm after the accident to determine why dikes holding coal-waste slurry failed, flooding 300 acres around the plant and the Emory River with 5.4 million cu yd of coal ash.
SUBSCRIBER LOGIN
Forgot your password?
loginregister subscription
Monthly Subscription:
Access all articles published on ENR.com for only $9.95/Month.
Annual Subscription:
Get ENR magazine for one year and access to all articles published on ENR.com, along with ENR daily news alerts and weekly newsletters for only $82/Year.
add to cart

Generic Keywords: (What are these?)
Construction Industry, News Articles, Business Conditions & Analysis, Markets, Finance, Costs, Legislation, Government, Management, Labor, Construction Methods, Equipment & Materials, Engineering News-Record (ENR)
----- Advertising -----
ENR's Top Lists
ENR attempts to bring structure to an otherwise huge and chaotic industry by performing annual survey and ranking companies engaged in general contracting, specialty contracting, engineering, architecture, planning and studies. View all.
ENR's Source Books
ENR publishes various sourcebooks each year which rank design firms, contractors participating in our surveys in almost fifty separate market sectors, giving them an opportunity to demonstrate their particular areas of expertise. View all.
Find a job in the Career Center
----- Advertising -----