|
This content is available for purchase. It is FREE of charge for ENR subscribers. |
Ongoing Canal-Related Work Is a Blast
Publication Date: 20-MAY-09
Author: C.J. Schexnayder Format: HTML
|
|
|
Description: This dry excavation, requiring removal of 47 million cu m, is needed to create the Pacific locks access channel–a 6.7-kilometer link between the existing navigation channel and the new locks to be built next to the Miraflores Locks. The Cocoli River, which empties into Miraflores Lake, is being rerouted 3.5 km. The 5 km-long Borinquen Road was also relocated.
Generic Keywords: (What are these?)
Construction Industry, News Articles, Business Conditions & Analysis, Markets, Finance, Costs, Legislation, Government, Management, Labor, Construction Methods, Equipment & Materials, Engineering News-Record (ENR)
|
|
----- Advertising -----
----- Advertising -----
|
|
|
|