This content is available for purchase. It is FREE of charge for ENR subscribers.

Ongoing Canal-Related Work Is a Blast

Publication Date: 20-MAY-09
Author: C.J. Schexnayder
Format: HTML

   
Description:
This dry excavation, requiring removal of 47 million cu m, is needed to create the Pacific locks access channel–a 6.7-kilometer link between the existing navigation channel and the new locks to be built next to the Miraflores Locks. The Cocoli River, which empties into Miraflores Lake, is being rerouted 3.5 km. The 5 km-long Borinquen Road was also relocated.
SUBSCRIBER LOGIN
Forgot your password?
loginregister subscription
Monthly Subscription:
Access all articles published on ENR.com for only $9.95/Month.
Annual Subscription:
Get ENR magazine for one year and access to all articles published on ENR.com, along with ENR daily news alerts and weekly newsletters for only $82/Year.
add to cart

Generic Keywords: (What are these?)
Construction Industry, News Articles, Business Conditions & Analysis, Markets, Finance, Costs, Legislation, Government, Management, Labor, Construction Methods, Equipment & Materials, Engineering News-Record (ENR)
----- Advertising -----
ENR's Top Lists
ENR attempts to bring structure to an otherwise huge and chaotic industry by performing annual survey and ranking companies engaged in general contracting, specialty contracting, engineering, architecture, planning and studies. View all.
ENR's Source Books
ENR publishes various sourcebooks each year which rank design firms, contractors participating in our surveys in almost fifty separate market sectors, giving them an opportunity to demonstrate their particular areas of expertise. View all.
Find a job in the Career Center
----- Advertising -----