Print this Articleprint this article   

Burj Dubai Surpasses 800 Meters

Text size: A A

Workers were scheduled to finish jacking the steel-pipe pinnacle atop the world’s tallest buildng on Jan. 10, marking the Burj Dubai’s topping out. The skyscraper’s curtain wall is 90% complete. But because of interior design changes, tower construction is not likely to be done until September, says Kyung-Jun Kim, project director for Samsung Corp. Crews jacked the pinnacle from within the structural steel spire that tops the reinforced concrete frame. The owner, Emaar Properties PJSC, still will not reveal the tower’s final height. However, project sources confirm the building is taller than 800 meters.

Burj Dubai Surpasses 800 Meters
----- Advertising -----

 

----- Advertising -----
Video Library
ENR's library has 100s of videos featuring eye-opening explorations of the world's most fascinating projects; exclusive reports on "extreme construction" and new techniques; and must-watch interviews with industry leaders.
ENR's Top Lists
ENR attempts to bring structure to an otherwise huge and chaotic industry by performing annual survey and ranking companies engaged in general contracting, specialty contracting, engineering, architecture, planning and studies. View all.
ENR's Source Books
ENR publishes various sourcebooks each year which rank design firms, contractors participating in our surveys in almost fifty separate market sectors, giving them an opportunity to demonstrate their particular areas of expertise. View all.
Find a job in the Career Center